Electromagnetic compatibility zone
An electromagnetic field is a field of force associated with electric charge in motion, which has both electric and magnetic components and contains electromagnetic energy.
Electromagnetic interference is disturbance that affects an electrical system due to magnetic and electric fields, electromagnetic induction or electromagnetic radiation emitted from an external source.
Electromagnetic compatibility zones are bounded areas in which specific levels of electromagnetic energy exist. Some electromagnetic compatibility zones contain higher levels of electromagnetic energy than others. In the railway environment, the area containing most energy in these electromagnetic compatibility zones exists on the trackside.
Ref The HS2 London-West Midlands Environmental Statement, published by the Department for Transport in November 2013.
[edit] Related articles on Designing Buildings Wiki:
Featured articles and news
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.